无码欧美成人AAAA三区在线_69堂亚洲国产日韩精品无码专区成人妻中文字幕一区二区三区在线久久久久_星辰影院

Welcome to [ Wuxi Funecon Precision Mould Plastic Co., Ltd. ] website! Home| Sitemap| Email
Moulding Your Future

Enquiry:

138-6185-1071

138-6185-1071

What are the main aspects of injection mold cooling water leakage

Injection mold cooling water leakage is a frequent occurrence, for many reasons, mainly in the following aspects:
The most occurs at the joint of the mold cooling water pipe. If water leakage is found, the sealing tape should be wound around the thread of the pipe joint and then tightened.
2, Due to long-term molding conditions, the waterproof ring inside the mold will be damaged, and the O-shaped waterproof rubber ring will easily harden and crack, resulting in water leakage. Some poorly installed waterproof rings can also cause seal failure. It is generally necessary to regularly check the installation position and sealing performance of the seal.
3, The hole wall of the cooling water hole is broken. This often happens when a new mold is tried. The wall thickness of the design is sufficient, but the hole wall is broken due to machining errors or post-processing. In most cases, leaking water holes can no longer be used.
4, Regularly repair the heating pipe and decompression pump and use. The heating tube is an effective heat transfer element and is very effective for core cooling of deep and deep structures. In the area where the cooling water is easy to pass, a one-way heating pipe is provided to reduce water leakage. In addition, the use of a vacuum pump to pump cooling water is also a method to prevent leakage of cooling water.
5, maintenance of the cooling water hole. It is easy to form scale in the cooling water hole, which hinders heat transfer. In severe cases, the water path is blocked and needs regular maintenance. For straight water holes, an iron bar that is 0.5 mm smaller than the diameter of the cooling water hole can be inserted and tapped with a hammer to remove scale and rust. For the cooling water pipe buried in the mold, the mold should be disassembled to remove rust.
After the inspection, the water leakage test should be carried out. The hand pressure pump is used to fill the water hole with water, and it is kept at a pressure of 2 MPa for 5 minutes. It is judged whether the water hole leaks by observing whether the water pressure is lowered. The water leakage can be blocked by mechanical fastening using elastic materials such as rubber and cork, and the room temperature curing type silica gel can be tried as a sealing material.
2018/08/02 10:11:16 6611 次

Hot News

Copy right of the 2018 Wuxi Funecon Precision Mould Plastic Co., Ltd. All Rights Reserved

78只科创板股票跻身百元股阵营|科创板 星环科技与亿道信息共拓AI PC新蓝海 10万台预装机将推向市场 精英汇集团就位于香港的物业订立租赁协议|精英汇集团 吴晓求:财政资源不能仅聚焦短期盈利项目 “投资于人” 等具有长远价值的领域同样应获资源倾斜 “两高”联合发布第三批行政公益诉讼典型案例 汇通达网络(9878.HK)、呼伦贝尔农垦集团战略签约暨首店开业 (乡村行·看振兴)广东仁里村:香水柠檬丰收 农旅融合助振兴 中加基金配置周报|中央经济工作会议召开,美联储降息25BP 关注加勒比局势 美媒:美在委内瑞拉附近拦截第三艘油轮 三湘印象:连续两个交易日收盘价格涨幅偏离值累计超过20%|三湘印象 科技赋能养老投资,打造智能投资管理新标杆——工银瑞信基金荣膺中国人民银行金融科技发展奖 广东东源:冬至萝卜粄传递客家温情 明日通车!包银高铁全线贯通运营 亚市早盘 黄金在地缘政治紧张局势下小幅走高 2025中国大运河沿线城市民歌展演 共绘运河文化新图景 观想科技拟收购辽晶电子不低于60%股权|观想科技 易点天下:2025前三季度研发投入1.09亿元,已超去年全年 俄罗斯副外长表示:俄反对日本围绕“拥核”可能性展开讨论 国际雪联自由式滑雪空中技巧世界杯崇礼站:中国队包揽混合团体项目冠亚军 白银集团:融合“千万工程”助推乡村焕新颜|白银市 场景开放筑平台 新质生产力激活经济新蓝海